Our project the end of July was the
bathroom. We made several trips
for supplies as changes in the plan
had to be made (that happens with
remodels).
Before - the bathroom has been
this decor for years, it was woodsy
and we had pictures of our trip to
the BigHorn Mountains on the walls.
So on to the new ~ the tub, toilet and
countertop were all replaced so now
in white. It was time to replace things, they
were 25 years old.
New flooring, we love the floor.
It caught our eye - waterproof, perfect
for the bathroom and super easy
to install.
The vanity was the biggest issue, we started
with just redoing it (staining it darker); then
moved towards replacing it since we had
trouble finding a vanity top that would fit.
The final on the vanity ~ we stayed with the
old vanity. It was the most
budget friendly and most timely (special
orders were 4-6 weeks out) and I
suspect longer with the covid 19
situation.
The vanity was taken apart and stained
darker (a gel stain), we found two vanity tops to
choose from in-store and added new plumbing.
We can always add new hardware to change
it up even more in the future.
The paint has had some time to cure, I
have been looking for decor items.
Next bathroom post will have the
wall decor :)